Behnke, Erdman, and Whitaker Engineering, Inc.  
   
 

Construction Review Options

 
 

 

Go Back >

Task Description Required Input
Site Inspection

Visit site to

  • Verify as-built installation
  • Evaluate workmanship
  • Verify permit compliance
  • Verify schedule conformance
  • Perform or witness sub system testing
  • Develop punch list and check its status as necessary
Construction drawings and project schedule
System Test

Witness or review data set to

  • Verify minimum period of continued operation
  • Assess actual vs. predicted output
  • Other contractual measure of acceptable performance
System fully operational and access to performance data where applicable
Performance Evaluation

Complete or spot evaluation of array, tracker, inverter through the use of

  • Spot voltage and current measurements
  • IV curves
  • As-installed array and system ratings
  • Independent performance monitoring
System fully operational
Final Completion

Verify the completion accuracy of all items to be declared listed on the Final Completion Notice, such as

  • System is ready for full, unattended commercial operation
  • System has passed inspections with AHJ
  • Utility interconnection installation evaluation complete
  • System tests passed successfully
Notice of Interim Completion prior to visit, Notice of Final Completion issued by the installer (with punch list), issued by supplier as soon as possible after visit